Reassigning a contract attachment to a master contract
Why this matters
Contract hierarchies mirror how your contracts actually relate to each other — a lease with its addenda, a framework contract with its individual orders, a master contract with its attachments. If an attachment accidentally slips out of this structure, or if you want to rearrange the hierarchy later, you don't need to delete and re-upload anything. You simply update the "Parent Contract" field — all data, tags, signatures and comments stay intact, and the attachment immediately re-appears nested under its master contract.
This saves time, prevents data loss, and keeps your contract overview clean — even months after the original upload.
How it works
- In the contract overview, open the attachment you want to (re-)nest under a master contract by clicking its title.

- Click "Edit" in the top right.

- Click into the "Parent Contract" field. A search dropdown opens, listing every contract in your workspace.
- Type the name of the master contract and select it from the list.

- If the "Type" field is also visible below: make sure it is set to "Attachment".
- Save your change.
The attachment now re-appears nested under the master contract in the overview, and you can expand or collapse it via the arrow to the left of the master contract.
Frequently asked questions
Do I need to delete and re-upload the attachment?
No. The "Parent Contract" field only changes the relationship — all data, comments, signatures and activity history stay fully intact.
Can I move an attachment to a different master contract?
Yes. Simply select a different contract in the "Parent Contract" field. It's exactly the same path as re-nesting.
Can I turn an attachment back into a standalone contract?
Yes. In edit mode, remove the entry from the "Parent Contract" field and adjust the "Type" field if needed.
I don't see the "Edit" button — what now?
You likely don't have edit permissions on this contract. Contact your workspace admin or check your role under "Settings → Roles & Permissions".
Good to know
- The change takes effect immediately — no need to reload the overview.
- An attachment can only be assigned to one master contract at a time.
- The master contract itself has no "Parent Contract" field — only attachments can be nested.
- When multiple attachments sit under one master contract, you'll see the count as a blue number next to the master contract's title in the overview.
Related articles
- How to link attachments — alternative approach via the Relations panel on the master contract
- How can contracts be uploaded in the system? — create a master contract with attachments directly at upload time
- How can multiple documents be handled in the system? — Documents tab as an alternative to the attachment structure
- How can I edit contracts?
Updated on: 04/20/2026
Thank you!
